Tocvan Begins Trenching Material for the Pilot Mine and Pushes Ahead With Infrastructure Development
BLOCKBLOCK(US:SQ) Accessnewswire·2025-12-22 07:05

Highlights: Pilot Mine Advancement: Tocvan has begun trenching material for Pilot Mine feed at the Gran Pilar South Block, secured local community approval, and initiated site preparation including clearing for heap leach pad and containment ponds to support the fully permitted 50,000-tonne facility. Infrastructure and Exploration Progress: Dozer cuts for channel sampling and ground leveling for processing equipment and access roads are underway, aligning with recent positive surface sampling and ongoing ma ...