Workflow
Q2 Metals Reports Multiple Wide, Mineralized Intercepts at the Cisco Lithium Project, Including 272.5 Metres at 1.61% Li20
Q2 Q2 (US:QTWO) Globenewswire·2025-09-29 11:00

Highlights: Three (3) drill holes from the 2025 drill program with strong analytical results are reported herein: CS25-036: nine (9) separate intervals, the widest being 272.5 m at 1.61% Li2O. CS25-038: 17 separate intervals, the widest being 66.5 m at 1.55% Li2O and 58.9 m at 1.09% Li2O. CS25-039: 12 separate intervals, including: 108.5 m at 1.62% Li2O,71.0 m at 1.84% Li2O, 77.7 m at 1.48% Li2O, and107.4 m at 1.87% Li2O Three (3) drill rigs continue to operate on the Cisco Project, with a fourth schedul ...